APA (7th ed.) Citation

Dalouchei, F., Mousavi, S. M., Antucheviciene, J., & Minaei, A. (2022). A Bi-Objective Model for Scheduling Construction Projects Using Critical Chain Method and Interval-Valued Fuzzy Sets. Buildings, 12(7), 904. https://doi.org/10.3390/buildings12070904

Chicago Style (17th ed.) Citation

Dalouchei, Fatemeh, Seyed Meysam Mousavi, Jurgita Antucheviciene, and Ahmad Minaei. "A Bi-Objective Model for Scheduling Construction Projects Using Critical Chain Method and Interval-Valued Fuzzy Sets." Buildings 12, no. 7 (2022): 904. https://doi.org/10.3390/buildings12070904.

MLA (9th ed.) Citation

Dalouchei, Fatemeh, et al. "A Bi-Objective Model for Scheduling Construction Projects Using Critical Chain Method and Interval-Valued Fuzzy Sets." Buildings, vol. 12, no. 7, 2022, p. 904, https://doi.org/10.3390/buildings12070904.

Warning: These citations may not always be 100% accurate.