APA-referens (7:e uppl.)

Yuan, C., Li, L., Su, X., & Du, R. (2025). Construction Risk Assessment of Tunnel Crossing Goaf Based on Analytic Hierarchy Process‐Extension Theory Model. Energy Science & Engineering, 13(1), 107. https://doi.org/10.1002/ese3.1983

Chicago-referens (17:e uppl.)

Yuan, Chao, Lian‐xin Li, Xiao‐wei Su, och Rong‐jie Du. "Construction Risk Assessment of Tunnel Crossing Goaf Based on Analytic Hierarchy Process‐Extension Theory Model." Energy Science & Engineering 13, no. 1 (2025): 107. https://doi.org/10.1002/ese3.1983.

MLA-referens (9:e uppl.)

Yuan, Chao, et al. "Construction Risk Assessment of Tunnel Crossing Goaf Based on Analytic Hierarchy Process‐Extension Theory Model." Energy Science & Engineering, vol. 13, no. 1, 2025, p. 107, https://doi.org/10.1002/ese3.1983.

Varning: dessa hänvisningar är inte alltid fullständigt riktiga.