Yu, X., Xie, J., Wu, Y., Wu, Q., Zhang, Z., & Wu, H. (2023). A Dynamic Numerical Simulation on the Grouting Timing in Retained Rib of Pillarless Mining. Applied Sciences, 13(16), 9479. https://doi.org/10.3390/app13169479
Chicago Style (17th ed.) CitationYu, Xianyang, Jinhao Xie, Yanju Wu, Qiuhong Wu, Zizheng Zhang, and Hai Wu. "A Dynamic Numerical Simulation on the Grouting Timing in Retained Rib of Pillarless Mining." Applied Sciences 13, no. 16 (2023): 9479. https://doi.org/10.3390/app13169479.
MLA (9th ed.) CitationYu, Xianyang, et al. "A Dynamic Numerical Simulation on the Grouting Timing in Retained Rib of Pillarless Mining." Applied Sciences, vol. 13, no. 16, 2023, p. 9479, https://doi.org/10.3390/app13169479.