APA-referens (7:e uppl.)

Yu, X., Xie, J., Wu, Y., Wu, Q., Zhang, Z., & Wu, H. (2023). A Dynamic Numerical Simulation on the Grouting Timing in Retained Rib of Pillarless Mining. Applied Sciences, 13(16), 9479. https://doi.org/10.3390/app13169479

Chicago-referens (17:e uppl.)

Yu, Xianyang, Jinhao Xie, Yanju Wu, Qiuhong Wu, Zizheng Zhang, och Hai Wu. "A Dynamic Numerical Simulation on the Grouting Timing in Retained Rib of Pillarless Mining." Applied Sciences 13, no. 16 (2023): 9479. https://doi.org/10.3390/app13169479.

MLA-referens (9:e uppl.)

Yu, Xianyang, et al. "A Dynamic Numerical Simulation on the Grouting Timing in Retained Rib of Pillarless Mining." Applied Sciences, vol. 13, no. 16, 2023, p. 9479, https://doi.org/10.3390/app13169479.

Varning: dessa hänvisningar är inte alltid fullständigt riktiga.