APA-referens (7:e uppl.)

Zou, X., & Rong, Z. (2025). Resource-constrained repetitive project scheduling with soft logic. Engineering, Construction and Architectural Management, 32(4), 2397-2429. https://doi.org/10.1108/ECAM-08-2022-0703

Chicago-referens (17:e uppl.)

Zou, Xin, och Zhuang Rong. "Resource-constrained Repetitive Project Scheduling with Soft Logic." Engineering, Construction and Architectural Management 32, no. 4 (2025): 2397-2429. https://doi.org/10.1108/ECAM-08-2022-0703.

MLA-referens (9:e uppl.)

Zou, Xin, och Zhuang Rong. "Resource-constrained Repetitive Project Scheduling with Soft Logic." Engineering, Construction and Architectural Management, vol. 32, no. 4, 2025, pp. 2397-2429, https://doi.org/10.1108/ECAM-08-2022-0703.

Varning: dessa hänvisningar är inte alltid fullständigt riktiga.