APA (7th ed.) Citation

Yang, Z., Yang, X., Zhang, J., Jiang, Y., & Gui, C. (2025). Cutterhead failure analysis during EPB shield excavation in urban metro tunnels. Acta Geotechnica, 1-18. https://doi.org/10.1007/s11440-025-02622-x

Chicago Style (17th ed.) Citation

Yang, Zhiyong, Xing Yang, Jiahui Zhang, Yusheng Jiang, and Chenghao Gui. "Cutterhead Failure Analysis During EPB Shield Excavation in Urban Metro Tunnels." Acta Geotechnica 2025: 1-18. https://doi.org/10.1007/s11440-025-02622-x.

MLA (9th ed.) Citation

Yang, Zhiyong, et al. "Cutterhead Failure Analysis During EPB Shield Excavation in Urban Metro Tunnels." Acta Geotechnica, 2025, pp. 1-18, https://doi.org/10.1007/s11440-025-02622-x.

Warning: These citations may not always be 100% accurate.