APA-referens (7:e uppl.)

Lin, P., Zhu, X., Li, Q., Liu, H., & Yu, Y. (2016). Study on Optimal Grouting Timing for Controlling Uplift Deformation of a Super High Arch Dam. Rock Mechanics and Rock Engineering, 49(1), 115-142. https://doi.org/10.1007/s00603-015-0732-z

Chicago-referens (17:e uppl.)

Lin, Peng, Xiaoxu Zhu, Qingbin Li, Hongyuan Liu, och Yongjun Yu. "Study on Optimal Grouting Timing for Controlling Uplift Deformation of a Super High Arch Dam." Rock Mechanics and Rock Engineering 49, no. 1 (2016): 115-142. https://doi.org/10.1007/s00603-015-0732-z.

MLA-referens (9:e uppl.)

Lin, Peng, et al. "Study on Optimal Grouting Timing for Controlling Uplift Deformation of a Super High Arch Dam." Rock Mechanics and Rock Engineering, vol. 49, no. 1, 2016, pp. 115-142, https://doi.org/10.1007/s00603-015-0732-z.

Varning: dessa hänvisningar är inte alltid fullständigt riktiga.